Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9753250

- Product Categories
- Friendly Links
- home > Supply > [Wear pressure plastic track] _ wear pressure plastic track construction materials plastic runway _ Berson
[Wear pressure plastic track] _ wear pressure plastic track construction materials plastic runway _ Berson
Information Name: | [Wear pressure plastic track] _ wear pressure plastic track construction materials plastic runway _ Berson |
Published: | 2014-04-08 |
Validity: | 0 |
Specifications: | Limitation |
Quantity: | |
Price Description: | |
Detailed Product Description: | Laying Process Description: ⑴ First check the flatness of the base layer, for leveling on uneven parts (such as cement concrete foundation requires pickling). ⑵ primer laying: Laying of foundation first cleaned before the end of plastic, ready for construction tool. a) in accordance with the process required to measure the position of the construction line, put the construction line. b) the laying of the venue starting from the side, according to the width of disposable plastic scraper sites. c) When scraping gum uniform speed, timely open at the end, depressions, bumps Department to conduct glue or gelling. d) After gelling of the audience should be examined to ensure that the surface of plastic laying thickness. ⑶ surface glue spreader: try to shorten a) Squeegee interval for each bucket of glue, so that a uniform speed glue. b) the thickness of the plastic surface of the observation time. c) shave gel, in front of uncured rubber, sprinkle with red plastic track particulate wear pressure manufacturers, wait until after fully cured, the excess rubber surfaces cleaned. d) spray, ensure that the particles do not fall off. ⑷ process line spray plans: Athletics venues and facilities in accordance with existing standards to accurately measure the position of the process line wear pressure plastic runway, then stencilled with polyurethane paint. Printing type slip plastic track first need to be waterproof cement or asphalt foundation basis for back treatment. Base layer can be dealt with the underlying maintenance paving the runway after 24 hours, with a plastic substrate doped with 25% according to national standard 3-4mm diameter high elastic black rubber, stir into the plastic runway construction site wear pressure, scraping Calibrating rake laying 10mm thick wear pressure plastic runway picture, curing and maintenance 24 hours. FT into the runway surface 2.5mm thick printing material, scraping rake Calibrating die above the cover with the printing material, printing die off after 24 hours, 2-3mm thick to see the printing surface. [Wear pressure plastic track] _ wear pressure plastic runway construction _ Berson Berson building materials provided by plastic track. Welcome to consult Berson, Rizhao, Shandong Building Materials Technology Co., Ltd. (www.cnbsfs.com), be sure to specify when contact is through the "Business Alliance Member" see, thank you! Contact: Lin Dong |
Admin>>>
You are the 51825 visitor
Copyright © GuangDong ICP No. 10089450, Berson, Rizhao, Shandong Building Materials Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 51825 visitor
Copyright © GuangDong ICP No. 10089450, Berson, Rizhao, Shandong Building Materials Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility