Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9753250

- Product Categories
- Friendly Links
- home > Supply > Berson mixed plastic materials mixed plastic runway runway construction [] _ ??mixed plastic track
Information Name: | Berson mixed plastic materials mixed plastic runway runway construction [] _ ??mixed plastic track |
Published: | 2014-03-14 |
Validity: | 0 |
Specifications: | Limitation |
Quantity: | |
Price Description: | |
Detailed Product Description: | Laying Process Description: ⑴ First check the flatness of the base layer, for leveling on uneven parts (such as cement concrete foundation requires pickling). ⑵ primer laying: Laying of foundation first cleaned before the end of plastic, ready for construction tool. a) in accordance with the process required to measure the position of the construction line, put the construction line. b) the laying of the venue starting from the side, according to the width of disposable plastic scraper sites. c) When scraping gum uniform speed, timely open at the end, depressions, bumps Department to conduct glue or gelling. d) After gelling of the audience should be examined to ensure that the surface of plastic laying thickness. ⑶ surface glue spreader: try to shorten a) Squeegee interval for each bucket of glue, so that a uniform speed glue. b) the thickness of the plastic surface of the observation time. c) shave gel mixed plastic runway construction, in front of uncured rubber, sprinkle with red particles, until fully cured mixed plastic runway, the excess rubber surfaces cleaned. d) spray mixed plastic track prices to ensure that particles do not fall off. ⑷ process line spray plans: Athletics venues and facilities in accordance with existing standards to accurately measure the position of the processing line, and then airbrushed with polyurethane paint. Determined by the slope method specified in Appendix C of conduct. Measurement sample hardness was prepared in accordance with the provisions of Appendix D D3.1 of the measuring method GB / T 531 regulations. Tensile strength, elongation at break of the samples was measured in accordance with Appendix D D3.1 provisions of Article prepared by GB / T 1.654 prescribed method for the determination of sunshine mixed plastic track, stretching speed of 100 ± 10mm/min. The difference between the results of two parallel determinations, the tensile strength of not more than 0.2Mpa, elongation at break of not more than 22%. Berson mixed plastic materials mixed plastic runway runway construction [] _ ??mixed plastic track materials provided by Berson. Search for "epoxy floor, epoxy floor, epoxy floor paint, epoxy self-leveling, emery flooring, anti-static epoxy floor, wall insulation, polyurethane playground, plastic runway, plastic stadium, each kinds of waterproofing works "reliable supplier network operators choose to have the whole alliance certification: Rizhao City, Shandong Province Berson Building Materials Technology Co., Ltd. (www.cnbsfs.com), trustworthiness and reliability, now click on the page" Business League Service "With our live chat now! |
Admin>>>
You are the 51825 visitor
Copyright © GuangDong ICP No. 10089450, Berson, Rizhao, Shandong Building Materials Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 51825 visitor
Copyright © GuangDong ICP No. 10089450, Berson, Rizhao, Shandong Building Materials Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility