Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9753250

- Product Categories
- Friendly Links
- home > Supply > Outdoor plastic runway | outdoor plastic runway Which | Berson building outdoor plastic runway
Information Name: | Outdoor plastic runway | outdoor plastic runway Which | Berson building outdoor plastic runway |
Published: | 2014-03-13 |
Validity: | 0 |
Specifications: | Limitation |
Quantity: | |
Price Description: | |
Detailed Product Description: | Outdoor plastic runway | outdoor plastic runway Which | Berson materials provided by Berson outdoor plastic track materials. Berson Rizhao City, Shandong Province Building Materials Technology Co., Ltd. (www.cnbsfs.com) Shandong Rizhao quality certified company Commercial Union, with Taiwan Yu-tai, Shandong Huiyuan, Guangdong Colson, Beijing built the Friends, Berson building materials, water and other brands, Dr. , has a good reputation, honesty, service-oriented "business alliance Service" icon on the page, we will be happy to serve you! Plastic runway construction requirements are as follows: 1, slope: horizontal <1% (curve 8 ‰, straight 5 ‰, semi-circular area 5 ‰), vertical <1 ‰, high jump area <0.4%, the surface should be flat and smooth, smooth drainage. 2, flatness: flatness pass rate above 95%, 3 m ruler error 3mm. 3, location: For accurate construction and painting lines need outdoor plastic track prices, applied firmly distinctive markers semicircle tangent point mark four runways and two center venues. 4, drainage: drainage system required two hours after the rain water discharge. In the frozen regions, between the asphalt layer and add a layer of gravel layer is preferably a buffer layer of geotextile. Foundation drains along the grooves of a special waterproofing treatment should be done. 5, the strength and stability: the foundation should have a certain strength and stability, uniform solid surface, no cracks, no bad side seams straight and smooth. Cushion outdoor plastic track compaction, density greater than 95%, after the mid-sized rolling machine pressure sunshine outdoor plastic runway, no significant wheel tracks, surface dust loose, wave and so on. 6, Warranty: base surface to keep clean and dry, after the completion of the asphalt base requirement maintenance period over 30 days to make the asphalt surface low boiling ingredients evaporate, ensuring the plastic layer and the foundation has sufficient bonding strength. Concrete foundation should have a 30 days warranty on outdoor plastic runway Which is good, use a large area to consider leaving joints. Before the foundation of concrete pavement layers need to be processed. Printing type slip plastic track first need to be waterproof cement or asphalt foundation basis for back treatment. Base layer can be dealt with the underlying maintenance paving the runway after 24 hours, with a plastic substrate doped with 25% according to national standard 3-4mm diameter high elastic black rubber, stir into the venue, scraping rake Calibrating, laying thickness 10mm cured 24 hours maintenance. FT into the runway surface 2.5mm thick printing material, scraping rake Calibrating die above the cover with the printing material, printing die off after 24 hours, 2-3mm thick to see the printing surface. |
Admin>>>
You are the 51825 visitor
Copyright ©2025 GuangDong ICP No. 10089450, Berson, Rizhao, Shandong Building Materials Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 51825 visitor
Copyright ©2025 GuangDong ICP No. 10089450, Berson, Rizhao, Shandong Building Materials Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility