Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9753250

- Product Categories
- Friendly Links
- home > Supply > Non-toxic plastic runway, non-toxic plastic track prices, Berson materials designed to do PE plastic runway
Non-toxic plastic runway, non-toxic plastic track prices, Berson materials designed to do PE plastic runway
Information Name: | Non-toxic plastic runway, non-toxic plastic track prices, Berson materials designed to do PE plastic runway |
Published: | 2013-12-09 |
Validity: | 0 |
Specifications: | Limitation |
Quantity: | |
Price Description: | |
Detailed Product Description: | Non-toxic plastic runway, non-toxic plastic track prices, Berson materials designed to do PE plastic track materials provided by Berson. Berson Rizhao City, Shandong Province Building Materials Technology Co., Ltd. (www.cnbsfs.com) Shandong Rizhao quality certified company Commercial Union, with Taiwan Yu-tai, Shandong Huiyuan, Guangdong Colson, Beijing built the Friends, Berson building materials, water and other brands, Dr. , has a good reputation, honesty, service-oriented "business alliance Service" icon on the page, we will be happy to serve you! Routine maintenance should pay attention to the following points: 1, plastic track laying was completed, needs maintenance 7-10 days to use. 2, the plastic runway drainage facilities under certain conditions have to adapt to all-weather use, the plastic runway as an athlete training, competition and the student movement and fitness workout with non-toxic plastic runway, does not apply for other purposes; 3, plastic runway to avoid harmful substances pollution and severe mechanical shock and friction sunshine toxic plastic runway, closed to traffic on the runway, heap ballast and sharp materials. Athletes must wear special shoes or sneakers. Shoes must not jump more than 12 mm, if the movement has a long nail laces toxic plastic track prices, sneakers nail length can not be more than 9 mm. 4, should pay special attention to protecting the edges of the plastic track, not any tilt. If you have found Road tooth damage should be repaired promptly notify the construction unit when blistering avoid more serious damage occurs. 5, keep it clean plastic track, often with water spray cleaning. I washed a small amount of glue surface water wiped off with a dry cloth. If oil stained plastic track, with 10% ammonia or detergent, washing powder and other scrub clean. 6, seasonal maintenance, cleaning should be carried out two large-scale annually. Washed with high-pressure water pipe is recommended throughout the venue. Must be timely sweep with a broom snow during the winter. If icing, prohibit the use of a hard object shovel to pry, should it naturally melts. 7, flammable and corrosive materials are prohibited to enter. Avoid contact with organic solvents, chemicals and machinery oil pollution. 8, avoid long-term load, avoiding fireworks and heat isolation. Avoid contact with organic solvents, chemicals, cigarette butts and other fire and pollutants. Laying Process Description: ⑴ First check the flatness of the base layer, for leveling on uneven parts (such as cement concrete foundation requires pickling). ⑵ primer laying: Laying of foundation first cleaned before the end of plastic, ready for construction tool. a) in accordance with the process required to measure the position of the construction line, put the construction line. b) the laying of the venue starting from the side, according to the width of disposable plastic scraper sites. c) When scraping gum uniform speed, timely open at the end, depressions, bumps Department to conduct glue or gelling. d) After gelling of the audience should be examined to ensure that the surface of plastic laying thickness. ⑶ surface glue spreader: try to shorten a) Squeegee interval for each bucket of glue, so that a uniform speed glue. b) the thickness of the plastic surface of the observation time. c) non-toxic plastic shave gel runway construction, in front of uncured rubber, sprinkle with red particles, wait until after fully cured, the excess rubber surfaces cleaned. d) spray, ensure that the particles do not fall off. ⑷ process line spray plans: Athletics venues and facilities in accordance with existing standards to accurately measure the position of the processing line, and then airbrushed with polyurethane paint. |
Admin>>>
You are the 51825 visitor
Copyright © GuangDong ICP No. 10089450, Berson, Rizhao, Shandong Building Materials Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 51825 visitor
Copyright © GuangDong ICP No. 10089450, Berson, Rizhao, Shandong Building Materials Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility