Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9753250

- Product Categories
- Friendly Links
Rizhao Epoxy, Epoxy latest construction technology
2013-09-22 Reads : 89
We all know the role of epoxy floor, but do not know Epoxy construction requirements, and its construction should pay attention to, these mainly through: the construction site requirements, pre-construction requirements, materials, stacking and other aspects of the analysis , here to talk about this issue. First, the construction site requirements: 1, the structure must be above C20 concrete strength, smooth surface free from loose phenomenon, after pouring curing period of 30 days, the surface flatness measurements on foot 2mm ≤ 3mm. 2, concrete floor moisture content below 8%, the air humidity is less than 80%, temperature 20-25oC construction is most suitable to be less than 5oC postponed construction. (This is very important) 3, construction plant floor concrete structure layer moisture treatment to be done next, avoiding the first floor epoxy affected by moisture, blistering, delamination. Second, pre-construction requirements: 1, pre-construction area calculation according to the construction material usage, preparing construction materials, according to the construction area, path, direction selection batching area. 2, ingredients region first pad layer plastic sheets, then covered with a layer of cardboard, so as not to contaminate the base surface material drip. (To do this, otherwise wasted) 3, prepare the ingredients necessary tools. Third, the material has been stored: All admission materials under different categories designated area and let go, and let someone custody, subcontractors, material sampling can detect the amount of construction in strict accordance with the design of picking construction. Fourth, the construction Ingredients: Ingredients construction materials by hand, in strict accordance with the requirements of materials, ingredients area with plastic skip step paving the ground, so as not to contaminate the base surface material. Waste or other waste to designated regional processing emissions. Fifth, the construction area of ??the air cleanliness requirements: The work area should be sealed and to prohibit the entry of officers and non-professional, non-cross construction. Air cleanliness must meet the cleanliness requirements. Six, security matters: 1, construction materials should be placed in a cool place closed, placed locale clearly marked prohibited close fire operations. 2, the material placed in area with fire safety facilities. 3, the material designated persons responsible for the custody, construction site safety supervisor is responsible for supervision. Seven, the use of protective epoxy floor: 1, after the completion of construction shall be filled epoxy curing period before use. (Failure to do so will shorten the useful life of epoxy) 2, the use of non-heavy collision or any sharp scratches. 3, no special chemical resistance requirements of the region can not be serious corrosive materials spilled on the bottom floor, so as to avoid damage on the epoxy floor. Epoxy construction of the entire area should be cleaned periodically to ensure that the surface appearance
keywords: Floor craft sunshine, sunshine epoxy floor, epoxy floor sunshine,
Admin>>>
You are the 51825 visitor
Copyright © GuangDong ICP No. 10089450, Berson, Rizhao, Shandong Building Materials Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 51825 visitor
Copyright © GuangDong ICP No. 10089450, Berson, Rizhao, Shandong Building Materials Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility